TEMPRITE ROOF TOP AIR MAKE UP
UNIT #447 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nov.23/99 |
Oct.6/00 |
Oct.15/01 |
|
Oct.19/04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
MAIN REGULATOR LOCKUP: |
12 "wc |
15.0"wc |
13.0"WC |
|
13.0"WC |
|
|
|
|
|
|
|
|
|
|
|
|
|
GAS PRESSURES |
Gas Supply "wc |
14 |
13 |
11.7 |
|
9.44 |
|
|
|
|
|
Low Fire "wc |
-4 |
-4.2 |
-4 |
|
|
|
|
|
|
|
High Fire "wc |
2.5 |
2.3 |
2.6 |
|
7.4 |
|
|
|
|
|
|
|
|
High Fire |
Low Fire |
High Fire |
Low Fire |
|
|
COMBUSTION AIR: O2 |
O2% |
9.2 |
10.1 |
11.2 |
16.7 |
10.8 |
16.4 |
|
|
|
|
CO ppm |
|
98 |
161 |
113 |
6 |
7 |
|
|
|
|
CO2% |
6.6 |
6.1 |
5.5 |
2.4 |
5.7 |
2.5 |
|
|
|
|
Stack F |
488 |
453 |
207 C |
76 C |
226.7 C |
226.7 |
|
|
|
|
Efficiency% |
74.8 |
86.9 |
76.20% |
80.70% |
76.1 |
76.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
OVERFIRE DRAFT (high
fire) "wc |
-0.93 |
-0.15 |
-0.18 |
|
-0.48 |
|
|
|
|
|
|
|
|
|
|
|
|
|
SAFETY CUTOUTS: |
Low Gas "wc |
2.5 |
OK |
OK |
|
OK |
|
|
|
|
|
Hi Gas "wc |
12 |
OK |
OK |
|
OK |
|
|
|
|
Flame Failure (within 4 sec) |
OK |
OK |
OK |
|
OK |
2 sec. |
|
|
|
|
|
|
|
|
|
|
|
|
|
SETTINGS: |
Roomstat C |
|
27 |
24 |
|
24 |
75 F |
|
|
|
|
Ductstat F |
|
70 |
75 |
|
|
70 F |
|
|
|
|
|
|
|
|
|
|
|
|
COMMENTS: |
|
|
|
|
|
|
|
|
|
Oct.19/04 |
1.) Changed out
downstream Fluid Power Actuator and installed new valve kit in gas valve |
|
|
|
2.) New Flame Detector
installed |
|
|
|
|
|
3.) Adjusted air linkage
to reduce CO (69 ppm) at low fire |
|
|
|
|
|
Oct.15/01 |
1.)
CO was 1300 plus at low fire! Adjusted combustion air damper linkage to give
more air at low fire |
|
|
2.) Adjusted supply gas regulator
from 12.7 to 11.7"WC |
|
|
|
|
|
3.) Down stream Fluid Power valve
leaking by somewhat (no change made at this time) |
|
|
|
4.) New ignition and detection
electrodes installed |
|
|
|
|
|
5.) Heat exchanger inspected for
cracks |
|
|
|
|
|
6.) Supervisory cock
greased (new pilot solenoid installed last year) |
|
|
|
|
Oct.6/00 |
|
|
|
|
Past Work Done: |
|
|
|
|
|
|
Upstream Fluid Power gas valve
replaced |
|
|
|
|
Combustion Air Fan cleaned |
|
|
|
|
|
Pilot solenoid valve replaced |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|